A Practical Traning Seminar On Kota Super Thermal Power ...

ELECTRICAL ENGINEERING. SESSION 2014-2015. A PRACTICAL TRANING SEMINAR ON KOTA SUPER THERMAL POWER STATION,KOTA. SUBMITED BY TRIPTI GUPTA B.TECH 7TH SEM. ROLL NO. 11EGKEE116 KOTA SUPER THERMAL POWER STATION INTRODUCTION KTPS is first coal based power plant in Rajasthan. It is ideally located on the left bank of

(DOC) Thermal Power Plant Project report | Niraj Mani ...

LOCATIONsuratgarh super thermal power station is located 27 km from suratgarh -15 km from suratgarh to biradhwal on nh15,then 12km in east from nh15.it is having extreme hot & cold climate and temperature varies between -1 to 50 ˚c development of green belt, about 3 lakhs plants of various species have already been planted in kstps and ash ...

free download kota thermal power plant ppt

Ppt on KTPS by NIKHIL SHRIMALI or KOA Super Tal Power. Video embedded 0183 32 ppt on KTPS By NIKHIL SHRIMALI or KOA super tal Power plant full report on Kota thermal Power plat for download power plant presentation...

ppt on kota super thermal power plant - SlideShare

Sep 17, 2014· ppt on kota super thermal power plant 1. Arpit Budania 11ESEEE015 B.Tech Electrical Engineering S.E.C,Dundlod By : 2. Topic 3. Introduction Of The Thermal Power Plant • It was established in 1983 • It was located on the left bank of the Chambal river at the upstream of Kota Barrage • 1st & 2nd unit are of 110 MW each • 3rd,4th&5th units ...

Presentation ON Kota Super Thermal Power Plant Kota ...

PRESENTATION. ON KOTA SUPER THERMAL POWER PLANT KOTA By : Aman Agrawal 09EVVME005 B.TECH. 4th Year Mechanical Engg. Vit (East), Jaipur INTRODUCTION OF THE THERMAL POWER PLANT It was established in 1983. It is located at the left bank of the CHAMBAL River at the upstream of KOTA BAIRAJ. 1st & 2nd units are of 110 MW each. 3rd,4th &5th units are …

Super thermal power station - Wikipedia

Super Thermal Power Stations (STPS) or Super Power Station are a series of ambitious power projects planned by the Government of India.With India being a country of chronic power deficits, the Government of India has planned to provide 'power for all' by the end of the eleventh plan.The capacity of thermal power is 1000 MW and above.This would entail the creation of an additional capacity of ...

Kota Super Thermal Power Plant: Presented By-Presented To ...

a. presentation on industrial training in mechanical departmnet at kota super thermal power plant presented by- presented to-. bhanu prakash yogi dr.bhawna mathur 15eghjme048 mr.suresh sharma section-a(3) 7th semester. mechanical engineering department

Kota super thermal power plant seminar - SlideShare

Oct 20, 2010· Its about training in kota super thermal power station,kota. Slideshare uses cookies to improve functionality and performance, and to provide you with relevant advertising. If you continue browsing the site, you agree to the use of cookies on this website.

Thermal Power Plant : Principle, Parts, Working ...

Sep 17, 2017· A simple steam plant works on Rankine cycle. In the first step, water is feed into a boiler at a very high pressure by BFP (boiler feed pump). This high pressurized water is heated into a boiler which converts it into high pressurized super heated steam. This high energized steam passes through steam turbine (a mechanical device which converts flow energy of fluid into mechanical energy) and ...

Training | Power Station | Electric Generator

The Kota Super Thermal Power Station is ideally at the left bank of Chambal River at Up Stream of Kota Barrage. The large expanse of water reached by the barrage provides an efficient direct circulation of cooling system for the power station. The 220 KV GSS is within kms. from the power station.

Thermal Power Plant Description - PowerPoint Slides

INTRODUCTION KOTA SUPER THERMAL POWER PLANT LOCATION Ideally on the left Bank of Chambal at up stream of kota barrage LAND Land measuring approx 250 hectare was required for the project in 1976. COAL Coal India ltd supply coal from its coal producing Subsidiaries BCCL,SECL.ECL Through railways wagons.

Kota Thermal Power Station ppt - Faadooengineers

Oct 15, 2012· Kota Thermal Power Station ppt; Results 1 to 1 of 1 . Thread: Kota Thermal Power Station ppt. Popular topic for study. STEAM POWER STATION DESIGN . ... ppt of industrial summer training in kota super power thermal station. Similar Threads: Power Station Engineering; Power station practice book needed!!!!

kota Super Thermal Power Station training ppt

Apr 15, 2013· kota Super Thermal Power Station training ppt 1. By : Aman Agrawal 09EVVME005 B.TECH. 4th Year Mechanical Engg. Vit (East), Jaipur 2. INTRODUCTION OF THE THERMALPOWER PLANT It was established in 1983. It is located at the left bank of the CHAMBAL River at theupstream of KOTA BAIRAJ. 1st & 2nd units are of 110 MW each. 3rd,4th &5th units are of ...

KOTA SUPER THERMAL POWER STATION - easystudy.info

KOTA SUPER THERMAL POWER STATION kota super thermal power plant.ppt (Size: 3.24 MB / Downloads: 477) INTRODUCTION It was established in 1973, comprising of 2 units of each of capacity 110 MW. It is located at the left bank of the CHAMBAL River at the upstream of KOTA BAIRAJ. 1st & 2nd units are of 110 MW each. 3rd,4th &5th units are of 210 MW .

shivaji choudhury ppt power plant

ppt on kota super thermal power plant - sagarhotel.in. Dec 7, 2011 The Kota Super Thermal Power Plant is an eminent power generation body that operates under the auspices of the Rajya Vidyut Utpadan Nigam Ltd. (RVUN) with the motto of implementing major reforms in states power sector. Online+; shivaji choudhury ppt power plant tfg.

Kota super thermal power plant,kstps ppt,RTU

Nov 08, 2014· Kota super thermal power plant,kstps ppt,RTU 1. Rajasthan's first major Coal fired Power plant established in the year 1983. Total installed capacity of KSTPS is 1240 MW. Located on the left bank of the Chambal River near Kota. 2.

A Presentation on Kota Super Thermal Power Station

Apr 28, 2015· Introduction of Kota Super Thermal Power Plant It was established in 1983. It is located at the left bank of the Chambal river at the upstream of the Kota Bairage. 1st and 2nd units are of 110 MW each. 3rd, 4th and 5th units are of 210 MW. 6th and 7th units are of 195 MW. Total generation capacity : (110+110+210+210+210+195+195)=1240 MW ...

Thermal Power Plant Working | Indian Power Sector.com

For thermal power plant there is a factor called Plant load Factor (PLF), so if a plant has installed capacity of 100 and it rums with PLF of 90% it will produce 90MWh of instantaneous power. On an average plf of plants are from 85-90%.

Thermal Power Plant Training PPT - Scribd

Kota super thermal power station generates 1240 MW power It also provides an opportunity to learn how the technology is used at proper place and time can have a lot of labor e.g. Wagon Tripler .


  • properties of nano silica in concrete ppt
  • conveyor system for material hanling ppt
  • cnc machine in power plants ppt
  • proses penambangan tanah liat cina ppt
  • site mixed concrete vs rmc ppt
  • ppt on slag crusher
  • iron ore beneficiation plant equipment flow diagram ppt
  • jaw crusher in ppt
  • uses of machines in construction industries ppt
  • perhitungan desain gyratory crusher ppt
  • coal crusher plant operation and maintenance ppt
  • cone crusher ppt
  • iron ore beneficiation plant process flow chart ppt
  • layout for crusher plant ppt
  • automobile industry in india ppt presentation
  • ppt pada produksi pasir hancur